Compare two fixed-plus-variable cost structures at a chosen volume and locate any nonnegative cost crossover.
The interactive form requires JavaScript. The worked example, formulas and source links below remain available.
Read the calculator result
A supplier quote can look cheaper than your internal cost per unit while creating little actual saving. The reverse can also happen: an internal department may appear inexpensive because equipment, supervision, or quality costs were left out. This calculator compares the costs that belong to each alternative over the same planning period and expected volume.
Use it for a component, printed item, fulfillment task, or other repeatable unit that can be supplied internally or purchased. The calculation separates a fixed cost for each option from its cost per unit. It then shows how the comparison changes as volume changes. The result is a cost scenario; it can’t determine supplier reliability, product quality, contractual obligations, or the value of retaining a skill inside the business.
Make vs buy: define the unit, period, and required quality
Begin with a unit that means the same thing under both alternatives. One accepted component is different from one component delivered if a supplier has a meaningful rejection rate. An hour of production is different from an hour of usable finished output. Convert the alternatives to a common quantity and specification before comparing prices.
Choose one period for the fixed costs and quantity. Annual in-house overhead can’t be compared directly with one month of purchases. If a tooling charge supports several years of production, decide whether this is a first-year cash comparison or a longer investment analysis. Don’t divide a one-time payment across years without explaining why that allocation fits the decision.
Enter the future fixed costs attributable to making and buying separately. For production, these might include a dedicated rental or supervision arrangement that changes with the decision. For purchasing, they might include a supplier setup payment, minimum retainer, or inspection program. Include a cost in an alternative only if it belongs to that scenario under the chosen scope.
Next, enter each alternative’s variable cost per accepted unit. An internal figure may include materials, incremental labor, consumables, and variable utilities. A supplier figure may need freight, inspection, packaging, or other incremental charges added to its quoted unit price. The tool uses your completed unit estimates; it doesn’t look up freight, duties, wages, or rejection allowances.
Separate avoidable costs from common overhead
OpenStax’s make-or-buy lesson explains why the decision depends on relevant costs and qualitative conditions. A fixed cost allocated to a product may remain after production is outsourced. Removing that allocation from a product report doesn’t itself remove the cash obligation.
For example, a building lease that continues under both alternatives doesn’t become a saving merely because an internal worksheet assigns part of it to the component. You can leave the same common cost outside both sides of a decision comparison or include it equally on both sides. Either treatment preserves the difference, provided you’re consistent and don’t present the resulting totals as a complete company budget.
A past expenditure is also different from a future commitment. OpenStax’s relevant-cost guidance distinguishes sunk costs from cash flows that change between alternatives. Money already spent on unsuccessful tooling doesn’t increase the future cash cost of continuing simply because management wants to recover it. Potential disposal proceeds, cancellation charges, and new tooling payments are separate future items that may matter.
Capacity has an economic value when it can serve another profitable use. If outsourcing frees a machine for a different order, evaluate that opportunity explicitly. The calculator has no independent demand forecast or capacity-allocation engine. A defensible opportunity-cost adjustment needs evidence about the work actually displaced or enabled, rather than an assumed full production schedule.
How the calculator works
For a quantity Q, let Fm be the fixed cost of making and Vm the variable cost per unit made. Let Fb and Vb describe the equivalent costs of buying. Make cost = Fm + Vm × Q. Buy cost = Fb + Vb × Q. The difference between these totals measures the modeled saving from the less costly alternative at that quantity.
When the unit costs differ, the algebraic crossover is Q = (Fm − Fb) ÷ (Vb − Vm). At that volume, the two total-cost lines meet. A fractional crossover describes the mathematical intersection; actual whole-unit orders may fall on either side. Inspect the total costs at the whole quantities your operation can actually use.
The crossover doesn’t necessarily mean making becomes cheaper at higher volume. That direction depends on which option has the lower variable cost. If the two variable costs are equal, there’s no unique volume crossover: the lower fixed-cost alternative remains less costly, or the two options tie when their fixed costs also match. A negative intersection doesn’t create a positive-volume purchasing threshold.
Make vs buy calculator example: a 10,000-unit requirement
Suppose making a component requires $30,000 of relevant fixed costs and $8 per unit. Buying requires $5,000 of fixed costs and $12 per unit. At 10,000 units, making costs $30,000 + $80,000 = $110,000. Buying costs $5,000 + $120,000 = $125,000. The modeled saving from making is $15,000.
| Units | Make cost | Buy cost | Saving from making |
|---|---|---|---|
| 0 | $30,000.00 | $5,000.00 | −$25,000.00 |
| 6,250 | $80,000.00 | $80,000.00 | $0.00 |
| 10,000 | $110,000.00 | $125,000.00 | $15,000.00 |
| 15,000 | $150,000.00 | $185,000.00 | $35,000.00 |
The crossover is ($30,000 − $5,000) ÷ ($12 − $8) = 6,250 units. Below that quantity, the lower buying setup cost outweighs its higher unit cost. Above it, the $4 per-unit saving from making offsets the extra $25,000 fixed commitment. The chart plots this relationship against unit volume, not months or years.
At 10,000 units, average total cost is $11 per unit made and $12.50 per unit bought. Those averages include the entered fixed costs spread over that particular volume. They are not the variable inputs of $8 and $12, and they should not be reused as variable costs in another run because that would count the fixed costs twice.
At zero units, the selected fixed commitments remain, but average cost per unit is undefined. If your actual arrangement allows avoiding a setup payment when no order is placed, that is a different cost structure to enter. The make vs buy calculator does not automatically cancel fixed costs at zero production.
Turn the comparison into a workable decision
First, reconcile the fixed-cost inputs with actual future commitments. Ask what contract could be canceled, what work could be reassigned, and when a saving would begin. If an internal rental can’t be ended for six months, an immediate full-year saving overstates the first-year effect. Separate transition costs from steady operation before choosing the period you want to model.
Then test more than one plausible quantity. Use a lower demand case, the current plan, and a capacity-constrained case. A crossover near the planned quantity makes the decision sensitive to forecasting error. If both alternatives have the same quality and timing, a large cost difference may be more robust; it still doesn’t remove the need to check whether the input costs are complete.
Next, verify the supplier quote’s commercial conditions. Minimum purchases, tooling ownership, price resets, delivery timing, warranty handling, and rejected-unit charges can change the relevant comparison. A flat unit price in this calculator assumes those conditions have already been converted into the entered costs or consciously excluded and documented.
Finally, place the result beside a cash schedule. A cheaper annual option may require a larger payment before any sales occur. Use the cash runway calculator for a simplified reserve projection and the equipment investment calculator when new equipment creates a multiyear stream of benefits. Neither should be added mechanically to this total without removing overlapping costs.
Where straight cost lines stop being useful
This model holds fixed costs and unit costs constant across the quantities tested. Real operations can have step changes when they add a shift, lease another machine, reach a freight threshold, or negotiate a quantity discount. Run separate scenarios for the ranges where each cost structure applies. A line extended beyond a production limit is a mathematical illustration, not a feasible operating plan.
Taxes, financing charges, inventory timing, inflation, and the resale value of equipment aren’t automatically calculated. Include only the costs the model’s inputs can represent clearly. For materially different payment dates, a discounted cash-flow comparison may be more appropriate than a same-period total.
Make vs buy calculator questions
Should I use the product’s full accounting cost?
Use a cost definition that fits the decision. A full accounting cost can contain allocated expenses that continue under both choices. Reconcile those amounts before treating them as avoidable. The comparison’s scope should be clear enough that another reader can tell which costs were included and which are common to both options.
Does buying always become more expensive as volume grows?
No. Both totals can rise with volume, and the relative slope depends on each unit cost. A supplier with a lower unit cost may become more attractive at high volume despite a setup charge. The equations, rather than the labels “make” and “buy,” determine the direction.
Can I use this for a service?
Yes, if you can define comparable units and a reasonable fixed-plus-variable cost structure. A completed support case or accepted design may work better than hours when provider productivity differs. Keep service standards and capacity constraints visible outside the arithmetic.
Is the lower-cost result a recommendation to outsource?
It identifies the lower modeled cost under the entered assumptions. Delivery resilience, confidentiality, quality, customer promises, and future flexibility can justify a different operating choice. Record those considerations alongside the numerical comparison so the decision can be reviewed later.
Questions or corrections?
Send a question or report an issue with a published page.